MESI Projects

BC Ministry of Transportation Kennedy Hill West Slide—Vancouver Island- 2011

 

Before After

Repairs included drilled and grouted soil nails with shotcrete facing.

 

BC Ministry of Transportation Kennedy Hill East Slide—Vancouver Island- 2011

 

Before After

Repairs included Geosynthetic Reinforced Soil (GRS) wall with drilled and grouted soil nails in a scarp and foundation.

 

BC Ministry of Transportation- Sutton Pass, Vancouver Island- 2011

 

Before After

Repairs included drilled and grouted soil nails with shotcrete facing also included a unique teardrop shoulder for additional road width.

 

Saskatchewan Watershed Authority- Theodore, SK- 2009

 

Before After

Theodore, SK Dam Spillway Embankment Failure. Repairs included the construction of a Geosynthetic Reinforced Soil (GRS) wall supported by soil nails that were used as micropiles.

 

Town of Moosonee- Moosonee, ON—2008

 

Repairs included installation of a granite rock toe berm. The upper slope was stabilized using soil nails.

 

 Saskatchewan Ministry of Highways- St Louis, SK- 2007

 

Before After

Repairs included a Geosynthetic Reinforced Soil (GRS) wall with soil nailed scarp and foundation.

 

Saskatchewan Ministry of Highways- Craven/Lumsden, SK 2005

 

Before After

Side slope failure along highway #20 near Lumsden, Saskatchewan. Repairs included soil nails with wire mesh, weeping tile and shotcrete finish.